Building defect report
For resolving a dispute before it reaches the Tribunal.
- Documents and explains each defect
- Recommended repairs you can send to the builder
- Faster and less formal
- Can be upgraded to an expert report later
Independent building expertise. Clear technical evidence.
Building defect assessments, construction dispute reporting and expert witness reports for residential building matters throughout Victoria. For owners, builders and their lawyers.
Every engagement is independently scoped to the nature and complexity of the dispute, with a written scope and fee before work begins.
| No. | Sev. | Defect summary | Location | Standard / clause | Photos |
|---|---|---|---|---|---|
| 1 | Major | Enclosed hobless shower: no waterstop projecting 5 mm above finished tile at screen line | Ensuite | NCC 2022 Vol 2 H4D2 / AS 3740:2021 Cl. 4.8.4(a) | Pic 1, Pic 2 |
| 2 | Major | Wall surfaces out of plumb | Bedroom 2 | VBA Guide to Standards and Tolerances 2015 Item 9.01 / AS 1684.2 | Pic 3, Pic 4 |
| 3 | Major | Membrane not sealed into floor-waste puddle flange | Laundry | AS 3740:2021 Cl. 4.3.1(a) | Pic 5 |
| Ref | Item | Legislation | Finding |
|---|---|---|---|
| L1 | No written building contract | Domestic Building Contracts Act 1995 (Vic) s.31 | No signed written contract was provided. Works proceeded on a written quote and verbal agreement. |
| L2 | No domestic building insurance | Building Act 1993 (Vic) s.135 & DBI Ministerial Order | No insurance certificate was provided before the deposit was paid or works commenced. |
Defects the builder won't fix, a job that's stalled, or a claim heading to VCAT.
For homeownersAn owner's claim or expert report has landed and you need an independent technical view.
For buildersBriefs for expert reports, response reports, conclaves and hearing attendance.
For legal practitionersFrom a first independent look at the defects through to expert evidence at hearing.
Formal expert evidence for domestic building proceedings, prepared to the Tribunal's expert evidence practice note.
Learn more →An independent technical report to document defects and push for resolution before proceedings start.
Learn more →An item-by-item reply to the other side's expert, stating where we agree, where we don't, and why.
Learn more →Leaking showers, bathrooms, laundries and balconies, assessed against the waterproofing standards.
Learn more →Costed repair scopes and Scott schedules that let the Tribunal compare each party's position item by item.
Learn more →When a job stops partway: what's complete, what's outstanding and what's defective.
Learn more →They look similar but do different jobs. The initial assessment tells you which one your matter needs.
For resolving a dispute before it reaches the Tribunal.
For filing as evidence in VCAT proceedings.
Every matter is different. The reporting scope, fee and timing are set in writing before we start, so there are no surprises.
Tell us the property, your role, the other party and any hearing or filing dates.
We review the information and documents you send and identify the technical issues.
You receive a written scope, fixed fee and delivery date for the report the matter needs.
Site inspection, then a report that records, assesses and scopes the repair of each item.
Findings are tied to the requirement each item departs from, cited only to clauses we have checked against the source.
Every report is authored and signed by a named, Victorian registered building practitioner. Their registration, qualifications and experience are disclosed in the report itself, and their opinions are confined to that expertise.
Our experts have run building companies and worked on the tools, so findings reflect how work is actually built and sequenced. That's what separates a genuine defect from a cosmetic complaint, and a workable repair from an over-scoped one.
Every matter is scoped individually because the number of items, size of the property and documents involved vary widely. Most matters start with an initial matter assessment from $495, which includes a desk review and a written scope and fee for the report you need. If you go ahead, the assessment fee is credited against the report.
Not in every case, but in most defect disputes the Tribunal needs evidence from someone qualified to say what's defective, why, and what it will cost to fix. Without it, the matter can come down to one party's word against the other's.
Yes. Many clients come to us before anything is lodged. A defect report at that stage can help resolve the dispute, and it can be converted to a formal expert report if proceedings follow.
Yes. We prepare item-by-item rectification scopes with costings where they fall within the expert's expertise, and Scott schedules. These are additional to the report and quoted separately before any work starts. If a matter needs a formal quantity surveyor's estimate, we'll tell you.
Whatever you have: the building contract, plans and specifications, variations, any existing inspection or expert reports, photos, correspondence with the other party, and any VCAT orders or directions. Send them after the initial call and we'll tell you if anything important is missing.
It depends on the scope, access to the site and the volume of documents. Your proposal includes a delivery date. If you have a hearing or filing deadline, tell us in your enquiry and we'll confirm up front whether we can meet it.
Yes. We attend compulsory conferences, expert conclaves and hearings to give evidence when required. Attendance isn't included in the report fee. It's charged separately and confirmed in writing before the date.
No. An expert's paramount duty is to the Tribunal, not the party paying. That independence is what gives a report weight. We give you an honest view of each item, including any that may not go your way.
No. VCAT Reports is an independent building consultancy. We're not affiliated with, or endorsed by, the Victorian Civil and Administrative Tribunal.